pg2

At the vessel

The story starts with UTR 745 at the wharf with a bombcart, awaiting a container discharge from vessel. The planning system first sends a request to 745 to bring a bombcart to Crane M1. UTR 745 gets container RMLU201054 and the planning system dispatches an updated work instruction telling the operator to take the container to stack V1.